[Qingyukou Reservoir in Tongjiang County, Sichuan officially started construction] On April 20, the Bazhong Qingyukou Reservoir in Sichuan Province officially started construction, with a total investment of more than 4.36 billion yuan. The maximum dam height of the reservoir is 74 meters, with a total storage capacity of 147 million cubic meters. The total construction period is 67 months, and the installed capacity of the power station is 20 trillion. Watts, the annual water supply is 18.68 million cubic meters. Editor/He Yuting
Click to see more live >>
Latest
  • 2026.06.09 17:52
  • [The giant energy heart of the Qinghai Tibet Plateau welcomes an important milestone]
  • On June 6, 2026, the first arch of the underground powerhouse of the largest pumped storage power station under construction in western China, Qinghai Wanrang Pumped Storage Power Station, officially began construction, marking the beginning of the main construction period of the cavern for this giant energy heart rooted in the Qinghai Tibet Plateau. The construction of the underground powerhouse has reached an important milestone, and the project construction has entered a new stage of construction.Editor/Gong Ziwei
  • 2026.06.09 17:46
  • [China Laos Joint Laboratory for New Power System Technology]
  • On June 4, 2026, China Southern Power Grid Corporation and the Ministry of Industry and Trade of Laos signed a joint construction agreement for the China Laos New Power System Technology Joint Laboratory in Beijing. The China Laos Joint Laboratory of Electric Power will focus on scientific research cooperation in the fields of green energy, digital power grid, power artificial intelligence, energy planning, etc., promote the systematic construction and sharing of China Laos electric power technology standards, collaborate on energy strategy research and think tank cooperation, and strive to create a global benchmark for clean energy cooperation in the South.Editor/Gong Ziwei
Share

Retrieve password

Get verification code
Sure