Product
CRCC slurry balance shield machine "Powerful China" went offline
Seetao 2022-11-17 14:27
  • Powerful is about to be transported to Qianhuang Section of Shenzhen Guangzhou Dongguan Shenzhen Intercity Railway for construction
Video Player is loading.
Current Time 0:00
Duration 0:00
Loaded: 0%
Stream Type LIVE
Remaining Time 0:00
Â
1x
    • Chapters
    • descriptions off, selected
    • captions off, selected
      Reading this article requires
      3 Minute

      On November 16, 2022, the "Powerful Country", a large diameter slurry balanced shield machine jointly built by CRCC and China Railway 22nd Bureau, was launched in CRCC First Industrial Park. The excavation diameter of "Powerful Country" is 13.27m, which will be used for the construction of the "Qianhai Huanggang Port Section" project between Guangzhou, Dongguan and Shenzhen.

      It is reported that the shield section of the project is 3511 meters long, with a minimum covering of 10.7 meters and a maximum buried depth of 46 meters. It passes through soft soil, soft upper and hard lower and hard rock strata for a long distance, and directly underpasses important buildings and structures and existing subway lines. The requirements for surface settlement control are high, and the construction is extremely difficult.

      The Qianhai Huanggang Port Section of Guangzhou Dongguan Shenzhen Intercity Rail Transit passes through Shenzhen Qianhai Cooperation Zone, Nanshan District and Futian District, with a total length of 21.167 kilometers. After the completion of the line, it is of great significance to improve the intercity rail backbone network in Shenzhen coastal area, support the rapid construction of key development areas such as Qianhai Free Trade Zone and Dongguan Binhai New City, and build an intercity railway network in Guangdong Hong Kong Macao Greater Bay Area.Editor/Ma Xue

      Comment

      Related articles

      Product

      The second-generation new products of Weichai's mining power were officially released

      05-09

      Product

      Risen Energy Unveils Risen Stack — A Powerful New Entry in Modular Energy Storage

      05-06

      Product

      Yidaxinneng will present N-type module solutions at SNEC 2024!

      06-19

      Product

      Hesheng Silicon Industry full chain independent manufacturing shine SNEC 2024!

      06-18

      Product

      Delivery of 1200 ton wind power installation platform for Chinese ships

      07-27

      Product

      Yancheng Canadian Solar energy storage products enter the market

      06-29

      Collect
      Comment
      Share

      Retrieve password

      Get verification code
      Sure