[Central Holdings' 18GW battery project settled in Huainan, Anhui] Recently, the "Second Huainan Transformation Development Conference" sponsored by the Huainan Municipal Party Committee and Municipal People's Government was held at the Huainan Guest House. A total of 50 projects were signed at the conference, with a total investment of 56.283 billion yuan. The signed projects include new generation information technology, new materials, high-end equipment manufacturing, new energy, energy conservation and environmental protection, life and health, new energy vehicles and other industries. Editor / Zhao E
Click to see more live >>
Latest
  • 2026.05.22 14:18
  • [The Hubei section of the Xi'an Shiyan high-speed railway has started operational testing]
  • On May 22, 2026, the Hubei section of the West Tenth High Speed Railway officially entered the operational testing phase. The total length of the line is 256.938 kilometers, with a designed speed of 350 kilometers per hour. It has 7 stations and crosses the Qinling Mountains to connect Xi'an and Shiyan. After opening, it will be connected to the Han Shi High speed Railway, with a travel time of about 1 hour from Shiyan to Xi'an and 3 hours from Wuhan to Xi'an. Wuhan, Zhengzhou, and Xi'an will form a high-speed railway triangle loop. Editor/Cheng Liting
  • 2026.05.22 14:17
  • [Ningxia adds 4000 tons of waste battery recycling project]
  • Recently, the Ningxia Government Service Network released a notice on the Environmental Impact Assessment of the Lithium Battery Dismantling and Tiered Utilization Project of Ningxia Zhongmi Technology Co., Ltd. The Yinchuan Approval Service Management Bureau has made an approval decision on the environmental impact assessment of the construction project. The project is located in Suyin Industrial Park, Yinchuan. Two power lithium battery recycling production lines will be built using vacant factories, with an annual processing capacity of 4000 tons of waste lithium batteries. The main products are aluminum powder, copper powder, and black powder. The total investment of the project is 51 million yuan, of which the environmental protection investment is 1.055 million yuan, accounting for 2.07% of the total investment, including the prevention and control of waste gas, noise, solid waste, and wastewater. Editor/Cheng Liting
Share

Retrieve password

Get verification code
Sure