News
Ningxia joint office model promotes joint reporting and installation
Seetao 2024-05-06 16:57
  • This project is of great significance in promoting social harmony and promoting digital transformation.
Reading this article requires
9 Minute

Since the beginning of 2024, Ningxia Hui Autonomous Region has actively responded to the country’s call for optimizing the business environment and relied on the construction project approval and supervision system to successfully develop and build a platform for joint reporting and installation of water, electricity, and heating networks to be efficiently completed. By building a five-in-one filing system with early intervention, one form of application, one online processing, one window acceptance, and one-stop review, the platform promotes a comprehensive joint management model for municipal public service filings across the region, bringing project entities the ability to reduce materials, The significant effect of reducing links, reducing time limits, and reducing costs has achieved the goal of service companies traveling less and not running away.

Establish a special work team to promote work implementation at a high level

Ningxia has set up a special task force to efficiently complete the joint installation of water, electricity, heating network, and established a horizontal coordination mechanism for the linkage of housing and urban-rural construction, municipal administration, natural resources, water conservancy and other departments, and the autonomous region, city, county (district) A comprehensive vertical promotion mechanism. At the same time, this work will be included in the annual optimization of the business environment, key points in the reform of the construction project approval system, as well as key contents in third-party evaluation and monthly dispatch. Through multiple channels to publicize reform measures and interpret service guidelines, all sectors of society's awareness and understanding of this work have been enhanced.

The work class has also established a closed-loop work system, including plan formulation, goal setting, grassroots practice, problem finding, evaluation suggestions, process optimization, advancement improvement and other links to ensure that something can be implemented quickly and achieve early results. .

Build a five-in-one system to optimize and adjust the approval process

Ningxia continues to optimize municipal service processes and streamline materials around the five major links of docking, declaration, approval, acceptance, and review. Through the Ningxia Engineering Construction Project Approval Supervision and Investment Online Supervision Platform, we can connect with construction units in advance and achieve real-time push of project information. Implement one form application and integrate the application forms for water supply and drainage, power supply, gas supply, etc. to realize one form for multiple purposes. Utilize a one-stop platform to unify the material list and process and improve approval efficiency. The service window accepts applications uniformly and urges municipal service enterprises to handle them within a time limit. During the completion acceptance phase, the leading department organizes a joint acceptance inspection to improve access efficiency. These measures have effectively improved the overall efficiency and user experience of municipal services.

Promote three reductions and one reduction to improve management quality and efficiency

Ningxia focuses on the four major elements of materials, links, time limits, and costs to significantly improve the efficiency of municipal newspaper installation services. Integrate application forms through a shared calling mechanism, set up a four-color list to reduce duplicate materials, and achieve a significant streamlining of application materials. At the same time, we promote integrated services, connect application and installation plans in advance, and simplify the handling process. Utilize parallel processing, remote survey and other methods to optimize the process and significantly shorten the approval time. In addition, the municipal service investment interface is extended to the user's red line, reducing institutional transaction costs, fully implementing online services, and effectively reducing corporate investment costs.Editor/Cheng Liting


Comment

Related articles

News

Khorgos Compressed Gas Transmission Breakthrough

05-16

News

Fujian Province’s imports and exports to ASEAN hit record high

05-16

News

Projects in Xinxiang, Henan start intensively

05-16

News

Yunnan Province in the first quarter of 2024 construction projects broke 100!

05-15

News

Major projects started in Junlian County, Sichuan in the second quarter

05-15

News

Merah DC Transmission Project: Energy artery of China-Pakistan Economic Corridor

05-15

Collect
Comment
Share

Retrieve password

Get verification code
Sure