[Weifang Hydrogen Production and Hydrogenation Integrated Station Pilot Project Starts]On July 16, 2024, Huadian Shandong Weifang officially launched a pilot project of an integrated hydrogen production and refueling station in the High-tech Zone. The project has a planned total system capacity of 105MW and will be constructed in two phases. This move marks that the project has entered a new stage of construction, aiming to alleviate the tight supply and demand of hydrogen in Weifang, and is designed to provide a stable hydrogen source for Weichai Power's hydrogen fuel cell research and development, hydrogenation station operations and hydrogen fuel buses. The project is expected to significantly reduce hydrogen transportation and storage costs, accelerate the vigorous development of Weifang's hydrogen energy industry, and inject strong impetus into the strategic goal of building a hydrogen energy city. Editor/Cheng Liting
On July 10, 2026, the Sri Lankan Tambutangama Water Supply Project, undertaken by a joint venture of Chinese enterprises, was completed, and the President of Sri Lanka attended the ceremony. The project is equipped with water plants, pipelines and other facilities, benefiting over 25000 households and effectively solving the local drinking water problem. It is an important livelihood cooperation project between the two countries. Editor/Min Jing
CHNG's Hainan Changjiang Nuclear Power Unit 3 achieved its first criticality and entered the stage of power operation. This project is the first Hualong No.1 nuclear power project in Hainan Free Trade Port. After completion, the annual power generation will be 18 billion kilowatt hours, which can significantly reduce carbon emissions and promote the development of green energy in the region. Editor/Min Jing