[Hangzhou Lin'an optimizes the allocation of photovoltaic resource elements] On December 5, 2025, the Development and Reform Bureau of Lin'an District, Hangzhou City, Zhejiang Province, responded to the relevant suggestions of the Fourth Session of the 17th People's Congress of the district, clarifying that it will further optimize the allocation of photovoltaic project resources and elements, coordinate the planning of photovoltaic development during the 15th Five Year Plan period, and promote the coordinated development of photovoltaics, energy storage, and power grid systems. The reply letter pointed out that Lin'an District will actively explore the photovoltaic development model with the participation of multiple entities, and encourage rural collective economic organizations to participate in the investment and operation of new energy projects through various means such as land use rights equity participation and joint ventures in accordance with the law. This measure aims to optimize resource allocation, promote the green transformation of regional energy structure, and achieve high-quality and sustainable development of the photovoltaic industry. Editor/Yang Meiling
Click to see more live >>
Latest
  • 2025.12.08 11:25
  • [China Railway 17th Bureau wins bid for large-scale energy storage project]
  • On December 5, 2025, the bidding results for the EPC (Engineering, Procurement, and Construction) of the 300000 kW/16/2.4 million kWh solid thermal storage and shared energy storage power station project in Shawan City were announced. China Railway 17th Bureau Group Construction Engineering Co., Ltd. successfully won the bid with a quotation of approximately 1.488 billion yuan, equivalent to a unit price of 0.62 yuan/watt hour. The bidder for this project is Shenyuan (Xinjiang) Investment Co., Ltd., which will construct a large-scale solid heat storage and shared energy storage power station located in Shawan City, Tacheng Prefecture, Xinjiang. The planned area of the power station is about 245 acres, and the main construction contents include an equipment plant of about 70000 square meters, a 220 kV substation and a booster station, as well as a shared energy storage facility with a daily energy storage capacity of 300000 kilowatts/16 hours/2.4 million kilowatt hours. This bid marks the official entry of the large-scale energy storage project into the construction and implementation stage, and its low energy storage system cost has attracted industry attention.Editor/Yang Meiling
  • 2025.12.08 11:24
  • [China Tianying steadily promotes grid connected testing of energy storage projects]
  • On December 5, 2025, China Tianying Co., Ltd. revealed on the investor interaction platform that its Rudong gravity energy storage project is steadily advancing the preparation work for grid connection testing. At the same time, the company's hydrogen based energy project construction in Liaoyuan, Anda and other regions is also underway simultaneously. The company introduces that its gravity energy storage technology has multiple advantages: stable technical performance, long service life without attenuation, and high safety; Raw materials for production can be made from waste, achieving basic pollution-free status; This technology comes with its own moment of inertia, which helps improve the disturbance resistance of the power system. In addition, this technology has low requirements for site selection conditions, strong adaptability, and rich application scenarios, and is considered to have the potential for large-scale promotion. China Tianying emphasized that the specific project progress should be based on the information publicly disclosed by the company. This move demonstrates the company's determination to continue investing and laying out in the fields of new energy storage and clean energy. Editor/Yang Meiling
Share

Retrieve password

Get verification code
Sure