[West Fenyang 400MW/800MWh independent energy storage project launches EPC bidding]On December 9th, the Fenyang 400MW/800MWh lithium iron phosphate independent energy storage project released a public bidding announcement. The bidding party for the project is Lvliang Zhonghejia New Energy Technology Co., Ltd., and the bidding organization is Zhonglian International Engineering Management Co., Ltd. The project is located in Fenyang City, Lvliang City, Shanxi Province, covering an area of approximately 140 acres. The total capacity of the project is 400MW/800MWh, and a lithium iron phosphate energy storage system will be used. It will be equipped with 80 sets of 5MW/10MWh energy storage units and a new 220kV energy storage booster station will be built. The project construction period is 24 months, and the funding source is self raised.Editor/Yang Meiling
In the early morning of the 17th local time, the US Embassy in Iraq in the "Green Zone" of the Iraqi capital Baghdad was attacked, and some facilities inside the embassy caught fire. From the evening of the 16th to the early morning of the 17th, the US Embassy in Iraq has been attacked multiple times.Editor/Gong Ziwei
The disclosure of the National 15th Five Year Plan in 2026 marks a breakthrough for the two major projects, the Shanghai Ningbo Cross Sea Corridor and the Zhanhai High speed Railway. The Shanghai Ningbo Expressway will achieve direct connection between Shanghai and Ningbo, the Zhanhai high-speed railway will adopt a ferry scheme, and the eight vertical and eight horizontal high-speed railway network will soon be closed.Editor/Gao Xue