[Gansu Yumen Independent Energy Storage Project EPC Bid Winners Announced] On December 19, 2025, the bidding candidates for the EPC general contracting project of Datang Group's 100MW/400MWh independent energy storage new construction project in Yumen, Gansu were announced. The first candidate for winning the bid is a consortium consisting of Beijing Haibosichuang Technology Co., Ltd., China Railway 17th Bureau Group Electrification Engineering Co., Ltd., and China Power Construction Northwest Survey and Design Institute Co., Ltd. The total bid price is 226605332.95 yuan, equivalent to a winning unit price of approximately 0.5665 yuan/Wh. The second candidate for winning the bid is a consortium consisting of Zhejiang Nandu Power Supply Co., Ltd. and China Power Construction Guiyang Survey and Design Institute Co., Ltd., with a bid price of 222376628.00 yuan and a winning unit price of approximately 0.5559 yuan/Wh.Editor/Yang Meiling
Click to see more live >>
Latest
  • 2025.12.22 18:35
  • [CGN will start construction of 5 new nuclear power units in 2025]
  • On January 22, 2025, China General Nuclear Power Corporation (CGN) received significant good news that Unit 2 of the Guangdong Lufeng Nuclear Power Project had successfully completed the first concrete pouring of the nuclear island. The achievement of this critical milestone is like pressing the start button for the main project of the unit, marking the official entry of the unit into the main construction phase. It is worth mentioning that, together with the Guangdong Lufeng Nuclear Power Unit 1, Shandong Zhaoyuan Nuclear Power Unit 1, Zhejiang Sanao Nuclear Power Unit 3, and Fujian Ningde Nuclear Power Unit 6 that have already started construction this year, China General Nuclear Power Corporation will fully open its firepower in 2025 and start five new nuclear power units at once. This series of actions not only demonstrates the strong strength and firm determination of CGN in the field of nuclear power, but also injects strong impetus into the optimization and adjustment of China's energy structure and the high-quality development of clean energy. Editor/Cheng Liting
  • 2025.12.22 18:34
  • [Lanshan County grid side energy storage power station starts construction]
  • On December 19, 2025, the EPC project of the shared energy storage power station on the power grid side of Lanshan County held a groundbreaking ceremony in the Economic Development Zone of Tafeng Town, attended by personnel from relevant provincial and municipal departments and Deputy County Mayor Pan Zhipeng. The project was registered on November 21, 2025 and is planned to be put into operation before June 30, 2026. It covers an area of approximately 20191 square meters and will include a 100 MW/200 MWh energy storage system, a 110 kV booster station, etc. It will be promoted by Pengli Energy Storage Technology with a total dynamic investment of approximately 250 million yuan. At 10:26 am, Pan Zhipeng announced the start of construction. This power station is of great significance in optimizing the energy structure and enhancing the stability of the power grid. All parties will ensure its construction and promote its early effectiveness. Editor/Cheng Liting
Share

Retrieve password

Get verification code
Sure