[The reconstruction project of the S26 highway has officially started] On January 3, 2026, the construction of bridge pile foundations for the reconstruction project of the S26 highway (provincial boundary G15 highway) officially began, marking the comprehensive launch of the upgrade project for this important passage connecting Shanghai and Jiangsu. The project starts from the border between Shanghai and Jiangsu provinces in the west and ends at G15 highway in the east, with a total length of about 18.8 kilometers, located in Qingpu District. The core content is to widen the main line of the S26 Shanghai Changzhou Expressway, upgrade it to a two-way 8-lane road by widening on both sides, and simultaneously implement the reconstruction of nodes such as Zhaozhong Highway and G15 interchange, as well as the optimization of toll stations. The project aims to improve road capacity and safety level, overcome traffic bottlenecks, and strengthen the rapid connection between Shanghai and the Suzhou Wuxi Changzhou metropolitan area. It is a key project to serve the integration of the Yangtze River Delta and optimize the western road network of the city. Editor/Cheng Liting
Click to see more live >>
Latest
  • 2026.01.05 10:41
  • [Hubei establishes an independent energy storage capacity compensation mechanism]
  • On January 4, 2026, the Development and Reform Commission and Energy Bureau of Hubei Province issued a notice clarifying the establishment of a new energy storage pricing mechanism from February 1, 2026. Establish a capacity compensation mechanism for independent energy storage projects on the grid side, with a standard of 165 yuan per kilowatt per year, and the compensation cost is shared by industrial and commercial users. Projects eligible for capacity compensation must be included in the regularly published list and are not allowed to lease capacity. This mechanism is tentatively scheduled to be implemented for one year to promote the healthy development of the new energy storage industry.Editor/Yang Meiling
  • 2026.01.05 10:41
  • [Inner Mongolia launches preliminary selection of energy storage projects for 2026]
  • On January 4th, Wengniute Banner in Chifeng, Inner Mongolia released the preliminary registration announcement for the 2026 Autonomous Region Independent New Energy Storage List project. The planned construction scale of the project is 300000 kilowatts/1.2 million kilowatt hours, and it is recommended to connect to the Zicheng 500 kV substation. The promotion of this independent energy storage power station will assist in the construction of regional energy storage infrastructure and the optimization of energy structure.Editor/Yang Meiling
Share

Retrieve password

Get verification code
Sure