[Hunan promotes the integrated development of transportation and energy]On January 26, 2026, the Development and Reform Commission of Hunan Province issued the "Implementation Opinions on Promoting the Integrated Development of Transportation and Energy in Hunan Province". The opinion clearly states that newly built or renovated transportation hubs such as railway stations, airport hubs, ports, and bus stations need to reserve photovoltaic construction conditions on the roof, and reserve construction conditions for energy storage facilities and prefabricated substations in the site area. The document encourages transportation stations to build energy storage systems as needed, establish an integrated microgrid system of source, network, load, and storage, and advocate the priority use of renewable energy such as geothermal energy and air energy for cold and hot supply. This move aims to strengthen the integration and mutual assistance between the power grid and the transportation network, plan energy storage facilities in advance to support the medium and long-term energy demand in the transportation sector, and achieve infrastructure co construction and coordinated development.Editor/Yang Meiling
On January 29, 2026, Jilin Province announced that the route and station location of the Liaoyuan section of the Changsi Liaotong high-speed railway have been determined. The project is designed with a speed of 350 kilometers per hour and a total length of approximately 334 kilometers, which will end the history of Liaoyuan not being connected to high-speed railways. The Provincial Development and Reform Commission stated that it is making every effort to promote the approval of pre feasibility studies and ensure their completion and opening to traffic by the end of the 15th Five Year Plan period. At that time, the travel time from Changchun to Liaoyuan will be shortened to about 45 minutes, and it will help Jilin achieve the goal of "connecting cities with high-speed rail".Editor/Gao Xue
At the beginning of the 15th Five Year Plan in 2026, State Grid and Southern Power Grid launched a nearly 5 trillion yuan investment plan, with energy storage becoming a key development focus. Zhiguang Electric announced on the evening of January 27th that it expects a net profit attributable to the parent company of 110 million to 160 million yuan in 2025, a year-on-year increase of 133.69% to 149.01%, achieving a turnaround from losses to profits, mainly due to the rapid development of energy storage business and significant growth in orders and revenue. The company's cascaded high-voltage energy storage system is adapted to the three major upgrade areas of the power grid and has been successfully implemented in energy storage projects in Inner Mongolia, Gansu and other places. It is expected to further grow in the new round of power grid construction.Editor/Gao Xue