[Beijing Erdaohe Reservoir enters the construction phase]Recently, the Erdaohe Reservoir in the upper reaches of the Dashihe River Basin in Fangshan District, Beijing has officially entered the construction phase and is expected to complete its main construction by the end of 2030. The Erdaohe Reservoir dam is 580 meters long and 100 meters high, and will become the tallest dam in Beijing after completion.Editor/Cheng Liting
The bidding for the design and construction (EPC) general contracting project of the second communication hub building and new DC1 civil engineering project in Lhasa, Xizang was completed. Zhongxun Post and Telecommunications Design Institute and China Railway 16th Bureau Joint Venture have become the first candidate for winning the bid with 77.6 million yuan. The project is located in Liuwu New District, with a total construction area of approximately 11400 square meters. It is planned to build a communication hub building and a power center, which can install 526 racks. The project aims to enhance Lhasa's communication security capabilities and data processing level, and improve the local digital infrastructure.Editor/Gao Xue
Hainan Province has released its 2026 major project investment plan, which includes 470 major projects with a total investment of 717.5 billion yuan. This year's planned investment is 128 billion yuan, covering areas such as infrastructure and industrial development. The newly started projects include key projects such as the Zhanjiang Haikou Railway and the Danzhou Yangpu Railway. This plan aims to serve the construction of Hainan Free Trade Port and consolidate the foundation for development.Editor/Gao Xue