[EPC bidding for Chongqing user side energy storage project] Recently, Pengshui County, Chongqing launched the EPC general contracting bidding for the user side energy storage project of public charging facilities. The estimated contract amount is about 120.2251 million yuan, equivalent to a unit price of 1.16 yuan/Wh. The total scale of the project is 51.672MW/103.344MWh, including 21.672MW/43.344MWh of supporting energy storage for public charging stations (serving 460 charging guns) and 30MW/60MWh of general industrial and commercial energy storage. The annual power supply capacity is 15.82056 million kWh and 21.9 million kWh respectively. The construction content covers municipal engineering such as site leveling, drainage, and enclosure, aiming to improve the energy efficiency of regional charging facilities.Editor/Yang Meiling
Click to see more live >>
Latest
  • 2026.02.11 16:06
  • [Zhejiang standardizes the management of virtual power plants]
  • The Zhejiang Electric Power Trading Center has issued an information disclosure reminder stating that virtual power plants (including load aggregators and distributed new energy aggregators) will continue to meet registration requirements for the year 2026. According to the requirements, registered virtual power plants must publicly disclose proof of continuous compliance with registration conditions, including assets, personnel, business premises, and technical support systems, through the electricity trading platform before the end of March each year. This regulation is implemented in accordance with the Basic Rules for Electricity Market Registration and the Management Measures for Electricity Sales Companies, in order to strengthen the compliance management of market entities.Editor/Yang Meiling
  • 2026.02.11 16:05
  • [PowerChina wins bid for EPC project of Hebei energy storage power station]
  • The EPC project of 200MW/800MWh energy storage power station in Baixiang County, Xingtai City recently announced the winning bid results. China Power Construction Group Kunming Survey and Design Institute Co., Ltd. successfully won the bid with 660 million yuan. The project is located in Beijiang Village, Guchengdian Town, Baixiang County. The construction includes an energy storage system, a 220kV substation, and transmission lines, with a planned construction period of 120 calendar days.Editor/Yang Meiling
Share

Retrieve password

Get verification code
Sure