[Hunan Liyang Plain Irrigation Project Starts Construction] On March 30, 2026, the national key water conservancy project - the continuation and modernization of the Liyang Plain Irrigation Area in Hunan Province - started construction in Changde Li County, becoming the first key water conservancy project to start construction in Hunan this year. The total investment of the project is 486 million yuan, covering 76 kilometers of anti-seepage measures for main and branch channels, 483 canal system building renovations, and information technology construction. The irrigation area covers 12 towns and streets in 3 counties, with a designed irrigation area of 404900 acres.Editor/Cheng Liting
Click to see more live >>
Latest
  • 2026.03.31 10:34
  • [Yumen Multi energy Complementary Project Builds Buffer for New Energy Grid Connection]
  • In March 2026, the CNNC Xinao Yumen solar thermal energy storage+photovoltaic+wind power project will be fully connected to the grid, with a total installed capacity of 700000 kilowatts and an annual power generation of 1.75 billion kilowatt hours. Yumen has formed a multi energy complementary system of wind, solar, water, fire, hydrogen storage, and has built the world's first 300 megawatt compressed air energy storage power station.Editor/Gao Xue
  • 2026.03.31 10:33
  • [玉门多能互补项目为新能源并网筑缓冲]
  • 2026年3月,中核新奥玉门光热储能+光伏+风电项目全容量并网,总装机70万千瓦,年发电17.5亿千瓦时。玉门已形成风光水火氢储多能互补体系,建成全球首台300兆瓦级压缩空气储能电站。编辑/高雪
Share

Retrieve password

Get verification code
Sure