[Wanhua Chemical's 16.8 billion yuan green power project is put into operation] On March 28, 2026, the first phase of Wanhua Chemical Haiyang Green Power Industrial Park's 100000 ton lithium iron phosphate project was put into operation, and the second phase started simultaneously. The total investment of this project is 16.8 billion yuan, and it adopts the green power direct supply mode. It is a major project in Shandong Province. As the world's largest chemical giant in MDI production capacity, Wanhua Chemical has established battery materials as its second main business, relying on an 800 person R&D team to achieve mass production of its fourth generation products.Editor/Cheng Liting
Click to see more live >>
Latest
  • 2026.05.22 14:18
  • [The Hubei section of the Xi'an Shiyan high-speed railway has started operational testing]
  • On May 22, 2026, the Hubei section of the West Tenth High Speed Railway officially entered the operational testing phase. The total length of the line is 256.938 kilometers, with a designed speed of 350 kilometers per hour. It has 7 stations and crosses the Qinling Mountains to connect Xi'an and Shiyan. After opening, it will be connected to the Han Shi High speed Railway, with a travel time of about 1 hour from Shiyan to Xi'an and 3 hours from Wuhan to Xi'an. Wuhan, Zhengzhou, and Xi'an will form a high-speed railway triangle loop. Editor/Cheng Liting
  • 2026.05.22 14:17
  • [Ningxia adds 4000 tons of waste battery recycling project]
  • Recently, the Ningxia Government Service Network released a notice on the Environmental Impact Assessment of the Lithium Battery Dismantling and Tiered Utilization Project of Ningxia Zhongmi Technology Co., Ltd. The Yinchuan Approval Service Management Bureau has made an approval decision on the environmental impact assessment of the construction project. The project is located in Suyin Industrial Park, Yinchuan. Two power lithium battery recycling production lines will be built using vacant factories, with an annual processing capacity of 4000 tons of waste lithium batteries. The main products are aluminum powder, copper powder, and black powder. The total investment of the project is 51 million yuan, of which the environmental protection investment is 1.055 million yuan, accounting for 2.07% of the total investment, including the prevention and control of waste gas, noise, solid waste, and wastewater. Editor/Cheng Liting
Share

Retrieve password

Get verification code
Sure