[Chongqing Guizhou back-to-back networking project starts construction]On April 29, 2026, the Chongqing Guizhou Back to Back Interconnection Project (Guizhou side) started construction in Xishui, Zunyi. Southern Power Grid invested 580 million yuan and plans to put it into operation in June 2027. The project involves the construction of 87.9 kilometers of transmission lines and 179 iron towers, connecting the national and southern power grids. The project is located in the mountainous area of northern Guizhou, and needs to overcome karst geology and 352 crossing difficulties. After being put into operation, it will meet the annual growth demand of 6.4% and 7.8% of the load in Chongqing and Guizhou. Editor/Cheng Liting
On May 18, 2026, Shanghai announced that it will enhance the resource allocation capacity of international shipping centers, vigorously develop high-end shipping services, promote financial technology, shipping insurance, digital trade and other matters, encourage enterprises to establish global supply chain management centers, and build digital management platforms.Editor/Gao Xue
In May 2026, the first full chain resource recycling system for rail transit in China will be put into operation in Tianjin. The steel and aluminum alloy recycling rate of retired subway trains exceeds 98%, and the remanufacturing of wind turbine blades and engineering machinery is being promoted simultaneously. By 2025, the total amount of recycled resources will reach 1.39 trillion yuan.Editor/Gao Xue