[The first dredging railway in the Six Scenic Area of Nanning Port has started construction] Recently, the first phase of the railway dedicated line project in the Six Scenic Area of Nanning Port officially broke ground. This line is the first dredging railway in the Six Scenic Area of Nanning Port. The total investment of the first phase of the railway dedicated line project in the Six Scenic Area of Nanning Port is 152 million yuan, with a designed annual loading and unloading capacity of 3.2 million tons. The line is connected to the Six Scenic Station of the Hunan Guangxi Railway, with a total length of 0.766 kilometers. It is constructed according to the single line diesel standard, with a designed speed of 40 kilometers per hour, and is expected to be completed in August 2027. Editor/Cheng Liting
Click to see more live >>
Latest
  • 2026.05.19 18:10
  • [2600 kilometers of sand crossing roads will be constructed in Inner Mongolia]
  • In 2026, Inner Mongolia plans to construct 2600 kilometers of sand crossing roads. As of the end of April, 41 projects have started construction and completed 710 kilometers, accounting for approximately 27% of the annual task. From Maowusu to Keerqin, a comprehensive battle to control desertification by road is unfolding. Editor/Cheng Liting
  • 2026.05.19 18:07
  • [Star Power Perovskite Space Photovoltaic Pilot Line Opened]
  • On May 18, 2026, Stellar Power announced that the company has started construction of the world's first perovskite space photovoltaic pilot line in the Energy Valley of Beijing Future Science City. The total investment of the project is about 150 million yuan, and it is expected to be completed and put into operation in August 2026, filling the gap in the large-scale verification of perovskite space photovoltaics. Editor/Cheng Liting
Share

Retrieve password

Get verification code
Sure