Recently, the candidate announcement for investors of the west extension line project of Qiaoxiao Expressway in Hubei has been released. The total investment of the project is estimated to be about 13 billion yuan.
Construction Content
The west extension of Qiaoxiao Expressway starts from the south of Maochen in Xiaonan District, connects to the second phase of Qiaoxiao Expressway, and sets up a branch line to connect to Beijing-Hong Kong-Macao Expressway, goes westward to the north of Bayi Industrial Park, south of Xiaogan South Station, and crosses the Weihe River Afterwards, it intersects with the Xiaohanying Expressway, develops the line in the northwest direction between Shahe and Geputan, then goes south of Yunmeng County, crosses the Fuhe River and goes south of Sanhe, and ends at the north of Yingcheng North Interchange and Wuhan The city circle and the ring highway are connected. The total length of the route is about 53.78 kilometers. It is proposed to build 10 new bridges of 39,879 meters, including 6 super-large bridges of 38,910 meters and 4 bridges of 969 meters. There are 4 hubs, 4 general exchanges, 1 service area, and 1 maintenance area. , and 1 monitoring and management sub-center.
Technical standards: The main line is constructed according to the standard of a two-way six-lane expressway with a design speed of 120 km/h and a roadbed width of 34.0 meters. Keywords: engineering news, engineering construction information, engineering construction
Winning bid information
The first place in the bid for this project: China Construction Third Bureau Group Co., Ltd. Congratulations to the winning bidder! Editor / Zhao E
Comment
Write something~