Petrochemical
Northeast green hydroaminol integration project intensive project
Seetao 2024-04-11 11:29
  • Projects are densely landed in the three eastern provinces, which, the total investment of many projects is more than 10 billion yuan
Reading this article requires
10 Minute

In order to solve the problem of new energy consumption, the green hydroammoniol integration project is replacing the previous single grid-connected power generation project, and has become a new direction for the development of new energy industry in the three Eastern provinces. According to the rough statistics of the Caixin reporter, in the past six months, there have been about 20 hydroammoniol integration projects filed or signed in the three Eastern provinces.

In this regard, the relevant person in charge of a wind power machine enterprise said that compared with the rapid increase in the installed scale of new energy, the grid planning is relatively lagging behind, more and more incremental green electricity is difficult to consume, and hydrogen energy is the most mature business model of global green electricity conversion, green hydrogen and its derivative green alcohol, green ammonia, will become the final destination of these massive off-grid green electricity.

The relevant person in charge of China Tianying also told Cailiannews reporters that the revitalization of Northeast China must develop new quality productivity, and it is necessary to rely on local resources for high-end industrialization. The development of landscape hydrogen storage and ethanol integration project is a strategic layout of high-end industrialization relying on local rich landscape resources and biomass straw resources. "Scenery hydrogen storage alcohol integration project is in line with the national industrial policy, in line with the international shipping and transportation fuel green development trend, industrial technology is mature, green finance, insurance funds, industrial funds and other investment bodies are enthusiastic, the industry will usher in a period of rapid development."

Three provinces of the eastern green hydroamine project intensive landing

In the recent stage, green hydroaminol integration projects have been intensively landed in the three Eastern provinces, among which, the total investment of many projects is more than 10 billion yuan.

On December 22 last year, Northeast Electric Power Design Institute Co., Ltd. and Nengjian Green Hydrogen ammonia New Energy (Songwon) Co., Ltd. successfully signed the EPC general contract project of Songwon Hydrogen Energy Industrial Park (Green hydrogen ammonia alcohol integration).

Public information shows that the project is an important project of Jilin Province to build "North China Hydrogen Valley" and "land scenery Three Gorges". With a total investment of 29.6 billion yuan, the project plans an annual output of 110,000 tons of green hydrogen, 600,000 tons of green ammonia/alcohol, supporting the construction of electrolytic cell equipment manufacturing production lines, comprehensive charging stations, and the establishment of hydrogen energy research institute, which basically covers the whole industrial chain of hydrogen production, hydrogen storage, hydrogen transportation, hydrogenation, hydrogen energy chemical industry, and hydrogen energy equipment.

On January 29 this year, Harbin Shuangcheng District and can build hydrogen Energy Co., Ltd. signed the "Harbin Shuangcheng Scenery hydrogen ammonia alcohol integration project" cooperation agreement, plans to invest 30 billion yuan, to create the whole industry chain.

On the evening of April 2, China Tianying announced that its wholly-owned subsidiary, Anda Tianying New Energy Co., Ltd. signed an investment cooperation agreement with the government of Anda City, Heilongjiang Province. According to the agreement arrangement, Anda Tianying intends to invest in the new "Anda Tianying Scenery hydrogen storage ammonia alcohol integration Project" in Anda City, with a total investment of 16.95 billion yuan.

According to the announcement, the new energy installed capacity of the project is 1.8GW, including wind power generation 1.4GW, photovoltaic power generation 0.4GW, supporting the construction of gravity energy storage and other comprehensive energy storage 140MW/280MWh; The scale of green hydrogen plant is 100,000 tons/year, the scale of ammonia plant is 38,000 tons/year, and the scale of methanol plant is 620,000 tons/year.

The relevant person in charge of China Tianying said that clean energy has a good market demand prospects, Anda region scenery natural resources outstanding endowment, high local policy support, industrial development speed and investment opportunity is better, it can be said that the current to create "scenery hydrogen storage ammonia alcohol integration project" the time, geographical, human and three elements are complete. Editor/Xu Shengpeng


Comment

Related articles

Petrochemical

Goldwind Technology's Green Methanol Production Project Officially Launched

04-25

Petrochemical

Invest 2 billion! Xinjiang graphite new material project officially started

04-24

Petrochemical

The natural gas pipeline project around the Tarim Basin is under construction

04-13

Petrochemical

Weiming New Material Nylon New Material Industry Project Launched

04-08

Petrochemical

Zhongjing Petrochemical's PDH project is officially put into operation

04-08

Petrochemical

Another major energy artery was added to southern Xinjiang

04-01

Collect
Comment
Share

Retrieve password

Get verification code
Sure