[CNOOC collaborates with Mingyang Intelligent Investment to build a new project] On January 21, 2026, CNOOC (Shanwei) Offshore Wind Power Co., Ltd., a joint venture between CNOOC and Mingyang Intelligent, will lead the Shanwei Honghai Bay Four Seas Wind Power Demonstration Project with a total investment of over 5.8 billion yuan. The project is planned to have an installed capacity of 500 megawatts and intends to install 28 18 megawatt fixed wind turbines, with an estimated construction period of 11 months. This cooperation is another major cross-border collaboration between the two parties in the field of offshore wind power, following the Hainan project. The aim is to integrate CNOOC's ocean engineering experience and Mingyang Intelligent's technological advantages, and jointly accelerate the layout of the new energy industry.Editor/Gao Xue
Click to see more live >>
Latest
  • 2026.02.06 14:34
  • [Anhui will start over 2000 key projects by 2026]
  • In 2026, Anhui Province will implement an effective investment promotion campaign, with over 2000 key projects starting throughout the year. During the 14th Five Year Plan period, the gross domestic product of Anhui Province has crossed two trillion yuan steps, with an average annual growth rate of 5.7%; The revenue of industrial enterprises above designated size has risen to fifth place, entering the ranks of major industrial provinces, and the high-quality development index of the manufacturing industry has risen to sixth place in the country. By 2025, the gross domestic product of Anhui region will reach 5.3 trillion yuan, with a growth rate of 5.5%; The total import and export volume has exceeded one trillion yuan; The actual growth rate of foreign investment utilization ranks first in the country. Editor/Cheng Liting
  • 2026.02.06 14:34
  • [Guangzhou and Dongguan plan to build a new Dongjiang Channel project]
  • On February 4, 2026, the Development and Reform Commission of Dongguan City released a public announcement before the evaluation of the "Social Stability Risk Analysis Report for the Dongjiang Channel Construction Project (Dongguan Side)". The Dongjiang Passage adopts the standard of first-class highway and urban trunk road, with six lanes in two directions, a design speed of 60km/h, and a total length of 3055m, including a tunnel section of 2535m. The construction content mainly includes road engineering, tunnel engineering, bridge and culvert engineering, water supply and drainage engineering, traffic engineering, lighting engineering, power pipe trench engineering, building engineering, greening engineering, etc. After the project joint review meeting, the total investment was 4.698 billion yuan. The plan is to start construction in January 2027 and open to traffic in June 2030, with a total construction period of 42 months. Editor/Cheng Liting
Share

Retrieve password

Get verification code
Sure