Transportation
Dafeng Port Railway Branch Line Approved
Seetao 2021-11-09 11:02
  • The project has a total length of 50.622 kilometers and a total investment of about 4.54 billion yuan
Reading this article requires
3 Minute

On November 4, 2021, the preliminary design of the Yancheng Dafeng Port Railway branch line was officially approved by the Jiangsu Provincial Development and Reform Commission.

Dafeng Port Railway Branch Line

The project starts at the southern end of Dafeng West Station on Xin-Chang Railway and ends at Dafeng Port Station. The main line is 50.622 kilometers long. It mainly builds new railway main line, Dafeng Port Station and Dafeng Port Logistics Center project, connecting with existing new ones. Dafeng West Station of Changjiang Railway and Dafeng South Station are reserved. The technical standard is National Railway Class II, single line. The total investment is about 4.54 billion yuan, and the construction period is two and a half years.

According to reports, the Dafeng Port Railway branch line is scheduled to start construction across the board in 2021. After completion, it will greatly improve the transportation system of the Dafeng port area of Yancheng Port, and drive the deepening of the regional economic and social development. Editor/He Yuting

Comment

Related articles

Transportation

Over 2 billion US dollars! COSCO Shipping plans to build 12 LNG dual fuel container ships

04-03

Transportation

Wuhan Hub Direct Line officially starts construction

04-03

Transportation

Wuhan Hub Direct Line Cross River Bridge Construction Starts

04-02

Transportation

North and South Xinjiang enter the era of 8-hour direct travel

04-01

Transportation

18.5 billion yuan! China Communications Construction wins bid for a major project

04-01

Transportation

Xianning International Land Port breaks through again

03-31

Collect
Comment
Share

Retrieve password

Get verification code
Sure