Transportation
Lop Nur to Ruoqiang railway pre-feasibility study passed the review
Seetao 2022-08-19 10:41
  • If completed in the future, the travel distance from Ruoqiang and other places to the Hami area will be greatly shortened
  • From the preliminary planning point of view, the total length of the line is 297.51km, starting from Luozhong Station of Harrow Railway in the east and reaching Ruoqiang Station in the west
Reading this article requires
4 Minute

On the afternoon of August 17, 2022, the National Railway Group organized a pre-feasibility study review meeting for the Lop Nur to Ruoqiang Railway. The government, the Second Division of the Corps, China Railway Urumqi Bureau Group Corporation, China Railway First Survey and Design Institute Group Co., Ltd., Xinjiang Railway Survey and Design Institute Co., Ltd. and other units attended the meeting.

The project is a national medium and long-term railway network planning project and the "14th Five-Year Plan". The total length of the line is 236 kilometers. The railway class is National Railway Class I, and the design speed is 120 km/h. The project is an important part of the railway skeleton network in Northwest my country, and mainly undertakes passenger and cargo transportation between Hotan, Kashgar, Hami and the mainland. The implementation of the project is of great significance to strengthening the functions of the two major channels, the middle channel and the south channel, in the core area of the Silk Road Economic Belt, improving the layout of the railway network in southern Xinjiang and eastern Xinjiang, and promoting the development of regional advantageous resources along the route. Keywords: infrastructure, infrastructure construction, domestic engineering news, planning and investment

In the next step, the Development and Reform Commission of the Autonomous Region will coordinate and promote the relevant departments to speed up the approval of the project feasibility study report, and strive to start the construction of the project as soon as possible. Editor / Xu Shengpeng


Comment

Related articles

Transportation

China Construction will undertake the construction of Kyrgyzstan International Airport

05-29

Transportation

Uber forces to pioneer initiative, integrating seamless travel through the Channel Tunnel.

05-26

Transportation

China's Shenshan Railway Station has entered the main construction stage!

05-20

Transportation

The second cross-border railway between China and Mongolia is about to start!

05-14

Transportation

New opportunities for Chinese enterprises! Sao Paulo, Brazil

05-12

Transportation

Laying 3 kilometers a day! China Railway builds a desert miracle!

05-06

Collect
Comment
Share

Retrieve password

Get verification code
Sure