Central enterprises
Construction of the first domestic 5000T crane ship started
Seetao 2023-02-14 10:27
  • The main hook of the ship has a lifting weight of 5,000 tons, and the lifting height on the deck can reach 133 meters
  • The ship uses 4 sets of MAN8L32/40 produced by Shaanxi Diesel as the main generator set with a power of 3850KW
Reading this article requires
3 Minute

On February 10, 2023, the construction ceremony of the first domestic 5,000-ton luffing pole dynamic positioning crane vessel invested and built by CCCC Third Harbor Engineering Co., Ltd. was held in Zhenjiang, Jiangsu. Yang Xiaoqing, deputy general manager of Shaanxi Diesel Heavy Industry Co., Ltd., was invited to attend the launching ceremony.

The ship is mainly used for offshore wind power pile foundation construction, booster station and large-scale offshore structure installation and marine engineering. The main hook has a lifting capacity of 5,000 tons, and the lifting height on the deck can reach 133 meters. It has dynamic positioning and anchoring positioning capabilities. Four sets of MAN8L32/40 produced by Shaanxi Diesel Engine Co., Ltd. are used as the main generator sets with a power of 3850KW, which can provide sufficient and reliable power guarantee for the ship.

This time, CCCC Third Harbor Engineering Co., Ltd. once again chose the products of Shaanxi Diesel Heavy Industry Co., Ltd. as the main generator set, highlighting the owner's trust and support for Shaanxi Diesel Heavy Industry Co., Ltd., Shaanxi Diesel Heavy Industry Co., Ltd. will also continue to uphold the business philosophy of customer first and quality first, overcome difficulties, plan in advance, organize meticulously, and deliver high-quality products to users on schedule. 


Comment

Related articles

Central enterprises

The first national standard zero carbon park has landed in Xiong'an Innovation Center

04-29

Central enterprises

CGN Delingha Solar Thermal Benchmark

04-29

Central enterprises

Sinopec deploys DeepSeeker V4 to compete for freshness

04-28

Central enterprises

26.9 billion revenue landed! China Power Construction leads the new energy storage track

04-28

Central enterprises

China Power Construction's pumped storage power dominates nearly half of orders

04-27

Central enterprises

CNCEC achieved a large order of 114.9 billion yuan in the first quarter

04-24

Collect
Comment
Share

Retrieve password

Get verification code
Sure