Transportation
National Highway 548 Seke-Wengda Section Reconstruction Work Started
Seetao 2023-05-23 11:13
  • The total length of the G548 reconstruction project is about 81 kilometers, and the construction of the second-class road standard
  • After completion, it will serve as the gateway and economic artery of Seda County, supporting the high-quality economic and social development of Seda
Reading this article requires
9 Minute

On May 21, 2023, the groundbreaking ceremony for the reconstruction project of the Seke-Wengda section of National Highway 548 was held in Luoruo Town, Seda County, Sichuan Province. Wang Senjian, deputy general manager of China Railway No. 4 Company, Chen Mou, general manager of Sichuan Highway Engineering Consulting and Supervision Co., Ltd., representative of Sichuan Traffic Survey and Design Research Institute Co., Ltd., all members of the engineering construction headquarters, construction unit, supervision unit, design unit, More than 200 people, including representatives of the masses, attended the commencement ceremony.

Yi Xizeren, deputy secretary of the county party committee and county magistrate, delivered a speech

During the event, the participating leaders listened to reports on project construction and other aspects. Luo Qi talked cordially with the main leaders of the county party committee, and introduced the plateau construction achievements and experience of China Railway No. 1 Bureau. He Biao spoke highly of the contribution made by China Railway No. 1 Bureau to the economic construction of Tibetan areas. He hoped that China Railway No. 1 Bureau will live up to the reputation of No. 1 Bureau in the world, build the National Highway 548 reconstruction project with high quality and efficiency, and make further contributions to the economic construction of Tibetan areas.

He Biao, Member of the Standing Committee of the State Party Committee and Secretary of the Seda County Party Committee, announced the start of construction

In his speech, Yi Xizeren emphasized that the construction of transportation is a contribution to the present and benefits to the future. It is hoped that all townships (towns), departments and the majority of cadres and workers must proceed from the overall situation, attach great importance to and actively serve the project construction, and strive to contribute to the National Highway 548 with a strong sense of responsibility, a pragmatic style, effective measures, and solid work. The Wengda section reconstruction project was implemented smoothly, accelerated construction, created a good environment, provided high-quality services, and effectively built the project into political roads, demonstration roads, high-quality roads, ecological roads, safe roads, revitalizing roads, clean roads, and Gongfu roads. The integrated development of transportation + national unity, transportation + rural revitalization, and transportation + global tourism provides the Seda model.

Visit the enterprise exhibition board and listen to the report of the project leader

In his speech, Luo Qi pointed out that firstly, it is necessary to improve the political position and build the National Highway 548 reconstruction project with high standards; secondly, it is necessary to strengthen project management and control and implement the main responsibility; thirdly, it is necessary to strengthen communication and coordination, and build a harmonious and civilized construction site. The employees participating in the construction of China Railway No. 1 Bureau will always carry forward the enterprise spirit of integrity, innovation and courage to strive for first-class, and quickly open the construction situation with high fighting spirit and full enthusiasm to ensure the smooth progress of the project. Hand in a satisfactory answer sheet for the Tibetan people.

Luo Qi introduced the construction experience of China Railway No. 1 Bureau in plateau construction

It is reported that the reconstruction project of the section from Seke to Wengda in Seda County of G548 is a section from Banma, Qinghai, to Serta, Sichuan, of the G548 line in the "National Highway Network Planning". The route starts from Seda County and is rebuilt along the Sequ River. Dazhen is connected to the G317 line, with a total length of about 81 kilometers, and is constructed according to the second-class road standard. Editor/He Yuting

Comment

Related articles

Transportation

Three bid sections of Xizang Bomi Ranwu Railway have been completed

12-13

Transportation

Hungary advances Budapest Airport railway project

12-13

Transportation

Germany adds 3 billion euros to launch road construction and bridge repair plan

12-13

Transportation

Colombia's Antioquia Province restarts riverside train project

12-12

Transportation

Ireland's railway electrification accelerates

12-12

Transportation

Chinese infrastructure shortlisted for Morocco high-speed railway station construction

12-12

Collect
Comment
Share

Retrieve password

Get verification code
Sure