Macro
Ningbo: Promote building photovoltaic, and strive to add 4GW by the end of 2027
Seetao 2025-02-20 09:49
  • New housing construction should ensure that the photovoltaic coverage rate of new buildings continues to be stable at more than 98%
Reading this article requires
4 Minute

Recently, the Ningbo Housing and Urban-Rural Development Bureau, the Energy Bureau and other departments issued the "Ningbo City to promote the construction of rooftop photovoltaic high-level construction three-year action plan (2025-2027)", the "plan" proposed seven action plans to promote the development of rooftop photovoltaic in the construction field of Ningbo City, and strive to add 4 million kilowatts of rooftop photovoltaic installed capacity by the end of 2027.

The seven action plans include: Photovoltaic building integration action plan for new buildings, demonstration leading plan for existing buildings in public institutions, renewal plan for rooftop solar hot water equipment in residential communities, renewal plan for photovoltaic roofs in urban residential communities, roofing finishing and resource utilization plan for existing public buildings, green electricity development plan for industrial buildings, and promotion plan for the entire town and village of rooftop photovoltaic of peasant families。

According to the "Plan", Ningbo City requires that the new housing construction should be fully mandatory to promote the distributed photovoltaic system, to ensure that the photovoltaic coverage rate of new buildings continues to be stable at more than 98%. For the promotion of the whole town and village of the rooftop PV of peasant families, it is required to guide the participation of social capital, and it is planned to build a number of photovoltaic townships and photovoltaic villages, and strive to build more than 5 rooftop PV of peasant families in continuous areas by the end of 2027. Editor/Xu Shengpeng


Comment

Related articles

Macro

Sunward has landed in the African market to draw a new chapter of win-win cooperation

06-12

Macro

China has added a new state-level green factory!

04-29

Macro

The Third Session of the 14th National People's Congress is held in China.

03-05

Macro

Saudi Cabinet approves new land transport system

02-21

Macro

Vietnam's green building industry is expanding rapidly, surpassing its 2030 target

02-21

Macro

Gansu: Accelerate the construction of super large, super large wind power base

02-20

Collect
Comment
Share

Retrieve password

Get verification code
Sure