On June 28, 2025, the construction and installation project of Xingang New Energy Vehicle Silicon Steel Project undertaken by China 20th Metallurgical Corporation started.
The new energy vehicle silicon steel project is a key step in the transformation of Xinyu Iron and Steel from "scale-driven" to "technology + market two-wheel drive". The project is located in the southwest corner of the intersection of silicon steel road and Lengzha Road in Xinyu Iron and Steel Plant, Xinyu City, Jiangxi Province, and the construction content includes 2 20-high rolling mill units, 1 continuous annealing coating unit, 1 finishing unit, 1 packaging unit, grinding roll room, emulsion room, corresponding to the main plant and supporting public and auxiliary rooms, as well as public and auxiliary buildings, ground treatment, equipment foundation, roads, greening and other civil construction in the main plant, process equipment, electrical, communication, instrumentation, water supply and drainage, heat, HVAC and other installation projects.
After the completion of the project, it will improve the output and quality of high-grade non-oriented silicon steel, increase the market share of new energy materials, and enhance and consolidate the competitiveness of Xingang in the silicon steel market. In recent years, China 20th Metallurgical Corporation has formed a long-term, stable and close strategic cooperative relationship in the fiery construction process of Xingang Group. Key projects such as the Xingang rolling project and the Xingang 4#5# sintering machine have been successfully completed and put into operation, creating one benchmark project after another under the mutual trust and cooperation between the two sides.(This article is from the official website of Seetao www.seetao.com. Reprinting without permission is strictly prohibited. Please indicate Seetao.com + original link when reprinting) Seetao.com Strategy Column Editor/Sun Fengjuan
Comment
Write something~