From 8:00 on March 21 to 8:00 on March 22, 2026, the Meishan Port Area of Zhoushan Port in Ningbo completed a container operation volume of 50755 TEUs day and night, becoming the first single container terminal in the port with a day and night operation volume exceeding 50000 TEUs.
Behind the new record lies the continuous efforts of Shuzhi Wharf. In response to the recent concentration of ships arriving at the port, Meishan Port Area has independently developed an intelligent equipment scheduling system for advance planning and real-time coordination. Through intelligent container loading and unloading technology and multi-channel sharing of container trucks, the system maximizes the efficiency of loading and unloading operations.

At the same time, the port area works closely with the dispatch command center and shipping companies to adopt personalized solutions for 200000 ton large ships, optimizing the operation path from the source. Keywords: New News Network, Harbor
At present, Ningbo Zhoushan Port has built 15 automated berths, and a group of three billion ton bulk cargo berths for ore, oil and gas, and coal has been formed, taking the port's digitalization construction to a new level.Editor/Gao Xue
Comment
Write something~