Transportation
Guangzhou-Zhanjiang high-speed rail starts on November 10
Seetao 2020-09-30 15:04
  • The newly-built dual line is about 400.1 kilometers, the speed is as high as 350 kilometers per hour, and there are 9 stations
Reading this article requires
5 Minute

On September 28, 2020, the "Announcement of the Tendering for the Total Price of the Construction of the New Guangzhou-Zhanjiang High-speed Railway Station" was officially released. According to the content of the bidding announcement, the project is scheduled to start on November 10, 2020, with a construction period of 5 years and completion at the end of June 2025.

The newly-built Guangzhou-Zhanjiang high-speed railway leads from Guangzhou Station to the west via Foshan, Zhaoqing, Yunfu, Yangjiang, Maoming, Zhanjiang, and finally to Zhanjiang North Station, with a speed of 350 km/h. The newly-built double line is 400.1 km. 9 stations will be newly established: Foshan, Shinkansen Airport Station, Xinxing South Station, Yangchun East Station, Yangjiang North Station, Mata Station, Maoming South Station, Wuchuan Station and Zhanjiang North Station. Zhanjiang East Station and Yangxi Station are reserved. Including the construction of new connection lines in Guangzhou hub and the construction of Zhanjiang North EMU.

The scope of this tender is the general contracting of the GZEPC-2 bid section of the new Guangzhou-Zhanjiang high-speed railway project in front of the station. It is divided into 9 bid sections and the mileage ranges from Foshan Station (excluding) to Xijiang Bridge and Xinxing South Station (not included). Inclusive) to Zhanjiang North Station (inclusive).

As the railway project with the highest standard, the longest line and the largest investment in the history of Guangdong Province, the Guangzhou-Zhanjiang High-speed Railway is an important part of the high-speed railway corridor connecting the Guangdong-Hong Kong-Macao Greater Bay Area with the Hainan Free Trade Port and the Beibu Gulf Urban Group. The important measures of the country's major development strategy are also a strong support for Guangdong Province to build a new pattern of regional development with one nuclear, one belt and one district. After the completion of the project, it will greatly shorten the time and space distance between Western Guangdong and the Guangdong-Hong Kong-Macao Greater Bay Area, greatly improve the travel conditions of the people in Western Guangdong, and drive and promote efficient economic and social development. Editor/He Yuting

Comment

Related articles

Transportation

Over 2 billion US dollars! COSCO Shipping plans to build 12 LNG dual fuel container ships

04-03

Transportation

Wuhan Hub Direct Line officially starts construction

04-03

Transportation

Wuhan Hub Direct Line Cross River Bridge Construction Starts

04-02

Transportation

North and South Xinjiang enter the era of 8-hour direct travel

04-01

Transportation

18.5 billion yuan! China Communications Construction wins bid for a major project

04-01

Transportation

Xianning International Land Port breaks through again

03-31

Collect
Comment
Share

Retrieve password

Get verification code
Sure