Macro
Guinea's Ministry of Engineering announces planned key road projects
Seetao 2020-12-28 09:55
  • The plan involves the upgrading of existing roads and the construction of interconnecting roads with neighboring countries
Reading this article requires
3 Minute

According to the information from the Ministry of Engineering of Guinea, in the next two years, from the beginning of 2021 to the end of 2022, Guinea plans to launch key road transportation projects as follows:

Category 1: Upgrading and paving asphalt road projects

National Highway 23: RN23 (Boké→Gaoual)

National Road 24: RN24 (Télimélé→Gaoul)

National Highway No. 5: RN5 (Labé→Komba)

National Highway No. 5: RN5 (Manda→Sintourou Komba)

National Highway No. 24: RN24 (Kindia→Télimélé→Gaoual) is 280 kilometers long

National Highway 27: RN27 (Labé→Tougué→Dinguiraye→Siguiri)

The second category: interconnecting highways with neighboring countries

From January 2021, the African Continental Free Trade Area will be officially launched. The Guinean government plans to quickly complete the interconnected road system with neighboring countries in order to facilitate the trade of goods with neighboring countries.

Liberia

National Highway No. 1: RN1 (N’Zérékoré → Yomou → Liberian border) is 85 kilometers long

Cote d'Ivoire

National Highway No. 38: RN38 (Tintioulé → Sabadou Baranaman → Boula Côte d’Ivoire border) length of 129 kilometers

Mali

National Highway No. 6: RN6 (Kankan → Siguiri → Kouremale → Mali border) is 213 kilometers long

Senegal

National Highway No. 8: RN8 (Labé → Mali → Kédougou → Senegal border) length of 185 kilometers edit/Xu Shengpeng


Comment

Related articles

Macro

China has added a new state-level green factory!

04-29

Macro

The Third Session of the 14th National People's Congress is held in China.

03-05

Macro

Saudi Cabinet approves new land transport system

02-21

Macro

Vietnam's green building industry is expanding rapidly, surpassing its 2030 target

02-21

Macro

Ningbo: Promote building photovoltaic, and strive to add 4GW by the end of 2027

02-20

Macro

Gansu: Accelerate the construction of super large, super large wind power base

02-20

Collect
Comment
Share

Retrieve password

Get verification code
Sure