On May 17, 2021, the Changchun High-grade Highway Construction Management Center issued a bidding announcement for the construction of the Nong'an to Jiutai section and Shuangyang to Yitong section of the Changchun Economic Circle Ring Expressway, with a total investment of 6.3 billion yuan.

The project is mainly composed of 2 sections of expressway main line, 3 sections of connecting lines, and 1 section of auxiliary roads. The high-speed main line is 124.841 kilometers long, of which the section from Nong’an to Jiutai is 93.191 kilometers long, and the section from Shuangyang to Yitong is 31.65 kilometers long. There are a total of 2924m/2 extra-large bridges, 1,200m/4 bridges, 1501m/22 middle bridges, 63m/3 small bridges, 88 culverts, and 14 interchanges (including 2 continued construction). There are 16 separation interchanges, 51 overpasses, 56 passages; 2 management offices, 2 maintenance work areas, 3 service areas, 2 parking areas, and 8 toll stations. The main line adopts the four-lane highway standard with a design speed of 120Km/h, and the subgrade width is 27 meters. Nong'an connection line: 3.467 kilometers in total length, with 5 culverts. It adopts the six-lane first-class highway standard with a design speed of 80Km/h, and the roadbed width is 33 meters. Dehui Connection Line: 5.549 kilometers in total length, with a small bridge of 19 meters per one, and two culverts. The four-lane first-class road standard with a design speed of 80Km/h is adopted, and the roadbed width is 25.5 meters. Jiutai connection line: 3.65 kilometers in length, with 40m/2 small bridges and 4 culverts. The four-lane first-class road standard with a design speed of 80Km/h is adopted, and the roadbed width is 25.5 meters. Nong'an to Dehui Fu Road: 39.157 kilometers in length, with 139m/2 middle bridges, 75m/4 small bridges, and 12 culverts. The secondary road standard with a design speed of 80Km/h is adopted, and the roadbed width is 12 meters. The planned construction period is from June 20, 2021 to October 31, 2023, 863 calendar days.

Bid division, construction site and scope of bidding: This construction bidding is divided into 1 bidding section. Housing construction projects (including gas stations and awnings), traffic safety facilities projects, external power projects, highway-rail overpass projects (only across the railway hole and its adjacent two holes) are not within the scope of this construction bidding. The specific bidding division and the scope of bidding are as follows.
Obtaining bidding documents
Anyone who intends to participate in the bidding shall use the following two methods to obtain the bidding documents (if the two are inconsistent, the written version shall prevail): Please apply from May 14 to May 20, 2021 (except statutory public holidays and statutory holidays). From 8:30 am to 16:00 am, on the fourth floor of Jilin Provincial Public Resources Trading Center (in the Government Affairs Hall of Jilin Provincial People's Government, 9999 Renmin Street, Changchun City), the window holders of Jilin Province Weibang Highway Technology Co., Ltd. are introduced Letter and the ID of the handler to obtain the paper bidding documents. Please download the bidding documents by yourself on the "Jilin Provincial Public Resources Trading Center Trading Platform" before the deadline for bidding.
Submission of tender documents
The deadline for submission of bid documents (the deadline for bidding, the same below) is 9:00 on June 9, 2021. The bid documents are submitted in the following two ways:The bidder shall submit the paper bidding documents (first envelope and second envelope) and the U disk containing the non-encrypted bid documents (the U disk needs to be sealed) to the public of Jilin Province from 8:30 to 9:00 on the same day The bid opening room on the fourth floor of the Resource Trading Center (in the Government Affairs Hall of the People's Government of Jilin Province, No. 9999, Renmin Street, Changchun). Bidders should upload the electronic bidding documents to the "Jilin Provincial Public Resources Trading Center Trading Platform" before 9:00 on June 9, 2021 (excluding 9:00). Bid opening time for the first envelope (commercial and technical documents) of the bidding documents: same as the deadline for bidding, location: Bid Opening Room on the fourth floor of the Jilin Provincial Public Resources Trading Center; bid opening time for the second envelope (quotation document) of the bidding documents: June 2021 At 14:00 on the 10th, the bid opening place: the bid opening room on the fourth floor of the Jilin Provincial Public Resources Trading Center.Editor/Xing Wentao、Design/Zhangtao