[Another project of Shandong Yulong Petrochemical officially started]Recently, Shandong Yulong Island Refining and Chemical Integration Project (Phase I) 600,000 tons/year acrylonitrile-butadiene-styrene resin (ABS) plant project started construction, with a total investment of about 127.4 billion yuan and a construction period of 24 months. Editor/He Yuting
On May 31, 2026, the excavation of the first foundation of the Dalat Mengxi 1000 kV AC power transmission and transformation project marked the substantial construction stage of the supporting project for the external transmission channel of the national Shagehuang large base. The project investment is 4.374 billion yuan, and a new double circuit line of 124.4 kilometers will be built, which is a key supporting facility for the ± 800 kV high-voltage direct current project from Mengxi to Beijing Tianjin Hebei. After completion, it will solve the problem of new energy consumption in the Kubuqi Desert and the central and northern parts of Ordos, providing solid support for the extension of the North China ultra-high voltage network to western Mongolia and ensuring clean power transmission to the Beijing Tianjin Hebei region.Editor/Cheng Liting
On June 1, 2026, the plan for the expansion project of Haikou East Station was publicly announced, with a total investment of 186 million yuan and an expansion area of 5970 square meters. The project will carry out a systematic renovation of the first and second floors of the station, adding barrier free facilities, expanding the waiting hall, optimizing the entry and exit flow lines, and simultaneously improving supporting facilities such as power supply and distribution, fire protection, etc. The construction adopts the "reverse edge construction" scheme to ensure uninterrupted operation.Editor/Cheng Liting