[Keppel builds the P-83 FPSO for the Buzios field]Keppel Offshore and Marine company Keppel O&M has won a contract worth about US $2.8 billion from Brazilian state oil company Petrobras to produce the P-83 floating production, storage and offloading vessel P-83 FPSO as part of the Buzios field development project offshore Brazil. The engineering, procurement and construction contract has been awarded to its wholly-owned subsidiary Keppel Shipyard. Editor/Xing Wentao
The China Russia border river emergency rescue floating crane project of Heilongjiang Provincial Water Traffic Rescue Center has started construction, with the addition of a 300 ton self-propelled floating crane and supporting work vessels, making it the largest self-propelled and fully revolving lifting vessel in the field of inland river rescue in the three provinces and one region of Northeast China. The ship integrates cutting-edge technologies such as full electric propulsion, intelligent search, and 300 ton lifting, filling the gap in modern salvage of large-scale accidents in the Jiehe River basin and building a fully chain intelligent salvage system. Editor/Cheng Liting
On June 2, 2026, the mobilization and deployment meeting for the construction of the northern section of the first phase of Beijing Metro R4 Line was held, marking the official entry of this high-capacity and fast backbone line located in the northeast direction of the capital into the construction phase. As a major landmark project for implementing the 15th Five Year Plan in Beijing, the northern section of Phase I of R4 Line is 20.78 kilometers long, starting from Dongba in Chaoyang District in the south and ending at Yanjing Bridge in Shunyi District in the north, connecting Chaoyang, Tongzhou, and Shunyi districts. Editor/Cheng Liting