Construction
Construction of Qilu Petrochemical Backpressure Unit Project
Seetao 2024-05-15 15:40
  • It has a profound impact on the transformation and upgrading of the coal-fired power industry
Reading this article requires
7 Minute

Qilu Petrochemical Company held a grand groundbreaking ceremony for the construction of three 80000 kilowatt backpressure units, marking another important project in the transformation and upgrading action plan of Shandong's coal-fired power industry officially entering the implementation stage. The commencement of this project not only demonstrates Qilu Petrochemical's firm determination in technological innovation and green development, but also indicates that the coal-fired power industry will usher in a new era of greater efficiency and environmental protection.

It is reported that the three 80000 kilowatt backpressure unit projects newly built by Qilu Petrochemical are the first backpressure unit project to start construction in the transformation and upgrading action plan of the coal power industry in Shandong Province. The project is planned to be constructed in two phases, including three 675 ton/hour coal-fired boilers and corresponding environmental protection facilities such as desulfurization, denitrification, and dust removal. Compared with the original unit, the new unit has achieved significant technological breakthroughs, with advantages such as high thermal efficiency, low coal consumption, and less pollutant emissions.

The construction of the project has multiple meanings for Qilu Petrochemical. Firstly, the new unit will provide stable and reliable steam and electricity supply to the company's refining equipment, meet the company's production needs, and improve production efficiency. Secondly, the new unit adopts advanced environmental protection technology, which will significantly reduce pollutant emissions, help improve environmental quality, and protect the ecological environment. Finally, the implementation of the project will also provide stable energy security for the economic development of Zibo City and even Shandong Province, promoting the sustainable development of the regional economy.

At the commencement ceremony, the relevant person in charge of Qilu Petrochemical Company stated that the company will strictly follow the project plan and technical requirements to ensure the quality and progress of the project. At the same time, the company will also strengthen communication and collaboration with the government and various sectors of society to jointly promote the transformation, upgrading, and green development of the coal-fired power industry. Keywords: engineering construction, engineering news, engineering construction information.

The commencement of the construction of three 80000 kilowatt backpressure units by Qilu Petrochemical is another important milestone in the transformation and upgrading of the coal-fired power industry. In the future, this project will inject new vitality into the sustainable development of the coal-fired power industry and make greater contributions to the energy industry in Shandong Province and even the whole country. (This article is from the official website of Jiandao: www.seetao. com. Reproduction without permission is not allowed, otherwise it will be punished. Please indicate Jiandao's website and the original link when reprinting.) Jiandao's mechanical column editor/Zhou Yingwen

Comment

Related articles

Construction

Shuangyashan Green Aviation Fuel Base officially launched

10-16

Construction

The autumn centralized construction of China's first heavy-duty Daqin Railway

10-08

Construction

The reconstruction project of the main trunk canal in Heihexi, Gansu Province was started

09-30

Construction

Jingzhou Libu Yangtze River Railway Bridge enters the main tower construction stage

09-29

Construction

Tuyi Technology Foshan Intelligent Manufacturing Base Project started

09-29

Construction

The Jingjiang River section waterway regulation project has started construction

09-27

Collect
Comment
Share

Retrieve password

Get verification code
Sure