On September 26, 2024, Zhangye City, Gansu Province, ushered in the groundbreaking ceremony of an important project in the field of water conservancy construction: the reconstruction of the upper section of the Heihe West Main Trunk Canal. The groundbreaking ceremony was held in Zhangye City, marking the official launch of the project and injecting new vitality into the water conservancy industry in Zhangye City.
At the groundbreaking ceremony, Chai Xiangqian, deputy secretary of the Municipal Party Committee, attended the ceremony and delivered an important speech. He pointed out that the main trunk canal of Heihexi, as the backbone of the city's water network with two horizontal and three vertical, multi-source mutual assistance, is not only a major artery and main channel of the city's water network, but also the backbone water transmission project of the grass, pear and west engineering systems. The implementation of the reconstruction project will effectively improve the efficiency of water resource utilization, shorten the irrigation cycle of farmland, and effectively ensure food security, which is of great practical significance and far-reaching historical significance for the ecological environmental protection and the conservation and intensive utilization of water resources in the Heihe River Basin.
Chai Xiangqian stressed that all relevant counties, districts and departments should fully understand the great significance of the project construction, concentrate their efforts, unite and cooperate, and create a good environment for the project construction. Water conservancy departments should earnestly perform their duties, strengthen the management of project construction, and ensure that project construction is carried out in a safe and orderly manner. At the same time, he demanded that all units participating in the construction should strictly follow the requirements of the 50-day construction of the West General Trunk, speed up the construction progress, ensure the quality of the project, and build the Heihexi West Main Canal Project into a high-quality project that can stand the test of history, be recognized by the people, and benefit one party.
The total investment of the project is 149 million yuan, and it is planned to carry out the overall reconstruction of 31.61 kilometers of channels in the upper section of the main trunk canal in the west of Heihe. The renovation includes the renewal of the canal system and buildings, the construction of the channel road, and the construction of new management systems such as automatic gate opening and closing, automatic flow measurement, and unmanned channel inspection. The introduction of these modern facilities will greatly improve the operation and maintenance efficiency and safety of the canal, and provide a strong guarantee for the agricultural irrigation and ecological environmental protection of Zhangye City.Editor/Jiang Mingyue
Comment
Write something~