Construction
China's driverless high-speed subway project starts in Türkiye
Seetao 2024-09-23 17:23
  • The localized production of this project has also reduced the overall cost of the project and improved its economic benefits
Reading this article requires
5 Minute

The commencement ceremony of Istanbul Airport Line Metro Localization Manufacturing Project was held in Ankara, Türkiye. This is the first time that the driverless subway project with a speed of 120km/h undertaken by CRRC has been started overseas, and it is also the first driverless subway project in Türkiye, marking the start of localized manufacturing of the fastest subway train in Türkiye. The Istanbul Airport Line subway train was developed by CRRC Zhuzhou Electric Locomotive Co., Ltd. It has a maximum operating speed of 120 kilometers per hour, uses a 4-car formation, and a maximum passenger capacity of 1100 people. The first phase of 10 trains was put into operation on January 22, 2023. The second phase is the localization manufacturing project of unmanned subway, with a total of 15 trains.

At the commencement ceremony, 13 local enterprises signed localization purchase agreements with CRRC Zhuzhou Locomotive Türkiye. It is reported that the localization rate of this localization manufacturing project of driverless metro is required to reach 60%. At present, localization procurement of car body, hood, seat, passenger information system and other parts has been signed to promote the development of Türkiye's rail transit industry chain.

Istanbul Airport Line is an important transportation link connecting the airport and the city center, and it is also the first high-speed subway line in Türkiye. It has opened 34 kilometers, with an average daily traffic volume of 800000 people. The localization and manufacturing of driverless metro trains will promote Türkiye's metro to be more efficient, high-quality and collaborative. (This article is from the official website of Jian Dao: www.seetao.com. Reproduction without permission is prohibited, otherwise it will be prosecuted. Please indicate Jian Dao website+original link when reprinting.) Jian Dao website mechanical column editor/Zhou Yingwen

Comment

Related articles

Construction

Shuangyashan Green Aviation Fuel Base officially launched

10-16

Construction

The autumn centralized construction of China's first heavy-duty Daqin Railway

10-08

Construction

The reconstruction project of the main trunk canal in Heihexi, Gansu Province was started

09-30

Construction

Jingzhou Libu Yangtze River Railway Bridge enters the main tower construction stage

09-29

Construction

Tuyi Technology Foshan Intelligent Manufacturing Base Project started

09-29

Construction

The Jingjiang River section waterway regulation project has started construction

09-27

Collect
Comment
Share

Retrieve password

Get verification code
Sure