Petrochemical
Ordos Coal Liquefaction Upgrade Demonstration Project Launched
Seetao 2025-10-14 09:51
  • The project has completed the bidding announcement of multiple engineering companies in the key installation stage
Reading this article requires
5 Minute

Recently, the Ordos Coal Liquefaction Upgrade Demonstration Project has successively announced the winning bids for the design, technology licensing, and service of multiple key devices, marking the substantive promotion stage of this national level coal chemical demonstration project with a total investment of 36.5 billion yuan.

The project is constructed by Guoneng (Ordos) Energy Chemical Co., Ltd. and is located in Shengyuan Industrial Park, Mengsu Economic Development Zone, Ordos, Inner Mongolia, covering an area of approximately 312 hectares. The project plans to build a 2.2 million ton/year coal direct liquefaction system, an 800000 ton/year coal indirect liquefaction system, and a supporting 1.2 million cubic meters/hour coal to gas system. The coal gasification system will provide hydrogen for direct liquefaction, synthetic gas for indirect liquefaction, and gas source for the existing 180000 tons/year liquefaction equipment in the park.

The project adopts the process route of "coal liquefaction hydrogenation stabilization hydrogenation upgrading", using Shendong Shangwan coal or supplementary tower coal as raw materials. The products will cover various energy and chemical products such as automotive diesel, military diesel, aviation kerosene, naphtha, liquefied gas, and asphalt coke. Keywords: infrastructure projects, infrastructure news and information, infrastructure information

With the gradual implementation of key device design and technical service contracts, the Ordos coal liquefaction upgrade demonstration project is accelerating from blueprint to reality. The promotion of this project will not only enhance China's independent technological capabilities in the field of coal to oil, but also provide important support for clean and efficient utilization of coal and energy strategic security. It is expected to play an industry demonstration role in optimizing product structure and improving energy efficiency after completion. Editor/Xu Shengpeng


Comment

Related articles

Petrochemical

China and Kazakhstan join hands to discuss oil, gas and chemical cooperation

04-01

Petrochemical

Winning the bid for the 20.8 billion coal chemical core project in Xinjiang

04-01

Petrochemical

68.5 billion yuan to reshape the map of Northeast Petrochemical

04-01

Petrochemical

35.6 billion yuan! Hunan Yueyang Million Ton Ethylene Project Starts Construction

03-31

Petrochemical

Hebei Huanghua Port 300000 ton crude oil terminal fully under construction

03-30

Petrochemical

35 billion! The Tangshan million ton project in Hebei Province has started construction

03-30

Collect
Comment
Share

Retrieve password

Get verification code
Sure