On May 20, 2020, the traffic engineering linking Shanghai Pudong Airport and the Lingang New Area-the Lianggang Avenue (S2-Dazhihe) Rapidization Project held a groundbreaking ceremony.
The project implementation scope starts from S2 Hulu Expressway in the south and reaches Dazhi River in the north, with a total length of about 12.8 kilometers and a total investment of 2.345 billion yuan. The implementation content includes the reconstruction of 3 node span bridges and the rapid facilities of some road sections. The main and auxiliary roads are used, and the main line is laid out in two-way six-lane + continuous ground auxiliary roads.
As an important part of the two-ring, one-link and two-height high-speed network in the new area, Lianggang Avenue has its important freight function complementary to the national highway G1503, which mainly undertakes passenger transport functions. At the same time, the S2 Hulu Expressway and the S3 Expressway under construction jointly build an important external passenger transport channel in the new area.
According to Zhao Yong, the management committee's exchange office, after the completion of the S2 to Dazhi River section of Lianggang Avenue, the new area will only take 25 minutes from Pudong International Airport, greatly reducing the distance of the new area to the world.
The construction of the project has strengthened the rapid connection of the surrounding areas, accelerated the integration of industrial linkage development through the construction of roads, and is conducive to the improvement of the new area ’s external transportation system and the Yangshan Port gathering and transportation system, strengthening the new area with the central city and the Yangtze River Delta Connection. Editor / Zhao Jing
Comment
Write something~