[Beihai Shipbuilding successfully delivered a 120000 ton lifting floating dock] On February 6, 2026, the 120000 ton lifting floating dock "Lucayan" jointly built by CSSC Beihai Shipbuilding and CSSC Trading was officially signed and delivered. The floating dock has a total length of 413.96 meters and a total width of 85.11 meters, with a designed lifting capacity of 120000 tons, and is classified by the British Lloyd's Register of Shipping. The dock is equipped with advanced automatic dock control system, which can achieve precise control of automatic floating and sinking, and can accurately match the dock repair and modification needs of the world's largest ICON class luxury cruise ship. Editor/Cheng Liting
Click to see more live >>
Latest
  • 2026.02.12 16:07
  • [Quanzhou partners with Ningde Times to jointly build a zero carbon battery factory]
  • The Quanzhou Municipal Government and CATL have officially signed a cooperation agreement for the new energy battery production base project, and the two sides will carry out in-depth cooperation on battery research and development and manufacturing. The project plans to adopt advanced green manufacturing technology, build intelligent and zero carbon modern factories, and improve the industrial chain to drive the coordinated development of upstream and downstream, further strengthening the ecological cluster of new energy industry in southeastern China.Editor/Yang Meiling
  • 2026.02.12 16:06
  • [Guangzhou's Zengcheng Now Accepting Bids for First Batch of 2026 Energy Storage Stations]
  • The Development and Reform Bureau of Zengcheng District, Guangzhou recently issued a notice to organize the application for the construction plan of the first batch of new energy storage power station projects in 2026. According to the requirements, new energy storage projects on the power supply and grid sides need to be included in the provincial construction plan before they can be connected to the grid. The application adopts a rolling plan approach, aiming to promote the construction of regional energy storage facilities in an orderly manner, support the peak shaving of the power grid and the demand for new energy consumption.Editor/Yang Meiling
Share

Retrieve password

Get verification code
Sure