[Inner Mongolia 40 billion BDO project filing] On April 28, 2026, the annual production of 750000 tons of BDO project by Inner Mongolia Jushanyuan was registered in Alxa High tech Zone, with a total investment of 40 billion yuan and covering an area of 1500 acres. The project focuses on upstream biodegradable plastic raw materials.Editor/Gao Xue
Click to see more live >>
Latest
  • 2026.05.11 10:23
  • [Heilongjiang Fuyuan Luobei Water Transport Port sets sail]
  • On May 6, 2026, Fuyuan and Luobei water transport ports will open and open for navigation simultaneously, and the Sino Russian border river passenger and freight transportation will resume operation, carrying the import of copper ore powder and the export of fresh flowers and other goods.Editor/Gao Xue
Share

Retrieve password

Get verification code
Sure