Chemicals
The Ma'anshan Shunbo Alloy Phase II project is about to be fully put into operation
Seetao 2026-06-17 16:35
  • The overall trial production operation will be achieved by the end of June 2026
Reading this article requires
6 Minute

The machine roars incessantly, the steel strip runs rapidly, and the workshop is filled with a hot production scene. The hot rolling workshop of Shunbo Alloy New Materials Industry Base Phase II is operating at full capacity on the core production line, while the equipment in other workshops is undergoing final debugging and will soon be fully put into operation.

This project is the top priority investment project in Bowang District, Ma'anshan, with a total investment of 4.8 billion yuan and an area of approximately 742 acres. It aims to build a complete production chain for melting, casting, hot rolling, cold rolling, heat treatment and finishing. According to Su Shaoyun, the project leader of Majian Group, the total construction area of the project is 331600 square meters, divided into two major production areas and five core production workshops.

The project has a huge scale and volume

The project is divided into two phases of construction, with a designed annual output of 630000 tons of aluminum flat ingots and 500000 tons of aluminum plate strips. After process optimization, the core production line has achieved stable mass production. The first phase of the aluminum flat ingot production line is running smoothly, with a monthly output of 13500 tons; The second phase hot rolling production line is operating at full capacity, with a monthly output of 12000 tons. High quality aluminum continues to be produced, providing stable raw materials for downstream industries such as packaging, power electronics, and transportation manufacturing.

All the main construction of the factory buildings in the base has been completed, and the equipment debugging work in the cold rolling and finishing workshops has been carried out in an orderly manner. The project plan is to complete all debugging by the end of June, with trial production capability, and the overall production capacity will be released centrally. Keywords: Ma'anshan, full aluminum industry chain, new materials

Outstanding benefits after production

Zhong Haitao, Deputy General Manager of Anhui Yubo Aluminum, said that after the full chain is put into operation, the monthly output can reach 15000 tons, and the annual production target is 100000 tons. The project has reached full production capacity with an annual output value exceeding 20 billion yuan, and can also provide hundreds of job opportunities for the local area, driving regional economic development.Editor/Gong Ziwei

Comment

Related articles

Chemicals

Ivory Coast's giant oil and gas field significantly increases production

06-17

Chemicals

BP collaborates with Azerbaijan SOCAR to boost production in the Caspian Sea oil field

06-16

Chemicals

Pakistan Pushes $4.5B Refinery Project to Cut Oil Import Dependence

06-13

Chemicals

SLB signs contract with PDVSA to bet on Venezuela's oil resources

06-12

Chemicals

Southwest phosphorus coal chemical industry enters the track of new energy materials

06-11

Chemicals

China's hydrogen coal co firing technology has made significant breakthroughs

06-09

Collect
Comment
Share

Retrieve password

Get verification code
Sure