New infrastructure
Millisecond-level voltage stabilization device deployed in Jiaxing
Seetao 2026-06-26 16:47
  • Jiaxing has put into operation a 20-kilovolt SVG device, upgrading power quality management
Reading this article requires
3 Minute

Recently, the State Grid Zhejiang Jiaxing Power Supply Company completed the commissioning of the 20-kilovolt static var generator (SVG) device at the Zhouquan 110-kilovolt substation. Hu Xiaodong, a staff member, explained that the equipment can achieve voltage regulation in as fast as 5 milliseconds.

This marks the first local initiative to independently implement such an engineering project. The new equipment has transformed the traditional crude switching mode of capacitors, achieving stepless precision compensation to suppress voltage fluctuations and harmonics, ensuring the operation of industrial precision equipment. Keywords: power grid, substation

This technological breakthrough not only strengthens regional power supply during peak summer demand but also provides voltage support for wind and solar power grid integration, enhances renewable energy absorption, facilitates the construction of a new power system, and lays a solid foundation for achieving carbon neutrality goals. (This article is published on Seetao.com and is protected by copyright. Unauthorized reproduction is prohibited. Please attribute the source as Seetao.com + original link.) Seetao.com Infrastructure Column Editor/Wu Zhiqiang

Comment

Related articles

New infrastructure

Gansu province seizes construction period projects to empower high-quality development

06-26

New infrastructure

Anhui Green Power Holding Certificate Enters Guangdong Province Across Provinces

06-26

New infrastructure

Suqian wheat harvesting and power personnel guard the entire process

06-26

New infrastructure

Zhejiang UHV Ring Network Wenzhou Station under construction

06-26

New infrastructure

Zhejiang UHV AC Ring Network Project Wenzhou Station starts construction

06-26

New infrastructure

Crossing railways and highways, Hubei's 500 kV power channel is fully connected

06-26

Collect
Comment
Share

Retrieve password

Get verification code
Sure