[CEEC 4 billion landed in a subsidiary of a state-owned enterprise] On July 3, 2026, Nenghe Juyuan (Tianjin) Enterprise Management Center, a 4 billion yuan scale capital platform under China Energy Construction, was registered and established in Dongjiang Free Trade Zone, Tianjin, jointly funded by multiple design institutes of the group. The platform establishment plan has been approved by the listed company in May 2026, with the group and its subsidiaries contributing 95% of the capital. The platform is used to coordinate and allocate internal funds, and improve the efficiency of fund utilization. At the same time, China Energy Construction is steadily expanding its operations, controlling costs, improving its ESG system, and expanding its growth channels through new energy businesses such as energy storage and hydrogen energy.Editor/Gong Ziwei
Click to see more live >>
Latest
  • 2026.07.06 11:18
  • [Guangzhou Metro Secures HCMC Metro Line 6 Consulting Bid]
  • Guangzhou Metro and two Vietnamese companies have won the feasibility study and design consulting contract for the first phase of Ho Chi Minh City Metro Line 6, with an amount equivalent to 11.98 million US dollars. This is the third subway project they have won locally. The consortium will take 270 days to complete the preliminary core work such as line planning and TOD development research.Editor/Min Jing
  • 2026.07.06 11:15
  • [Pre-qualification Opens for China-Thailand High-Speed Rail Track & E&M Works]
  • The national railway procurement platform has released a pre qualification announcement for the first phase of the China Thailand high-speed railway in Bangkok's Nakhon Ratchasima section, covering the entire track, power supply and communication signal construction in four sections. The bidding qualification thresholds for each section have been clarified, and the project has bid farewell to civil construction and entered a critical stage of track equipment installation.Editor/Min Jing
Share

Retrieve password

Get verification code
Sure