[Empowering high-quality development of energy and electricity with AI] The China Electricity Council held the "July 26th Electricity Theme Day" in 2026, and Xin Bao'an delivered a speech. The report shows that by 2025, China will add 550 million kilowatts of new power generation capacity, with wind and solar power accounting for nearly 80% of the total. The low-carbon transformation has achieved outstanding results. He proposed that the development stage of new energy needs to rely on AI to improve the new power system, and the integration of artificial intelligence is the key to cultivating new quality productivity of electricity, ensuring energy security, and achieving dual carbon. As the starting year of the 15th Five Year Plan, 2026 will seize the opportunity of computing and electronics collaboration, and deepen the integration of digital and intelligent technology with the power industry.Editor/Gong Ziwei
Click to see more live >>
Latest
  • 2026.07.29 11:00
  • [LSHEC’s Xinjiang Tower Project Enters Final Sprint Phase]
  • CRCC has won the bid for the open-pit mining and stripping project at the southern mining site of Mirado Copper Mine in Ecuador. The framework contract period is as long as ten years, including drilling and blasting, transportation and dumping, and maintenance of supporting facilities. The total scale of mining and stripping is huge, and the operation is planned to start in September 2026. Editor/Min Jing
  • 2026.07.29 10:59
  • [LSHEC’s Xinjiang Tower Project Enters Final Sprint Phase]
  • LSHEC has developed six large towers for the low-carbon integration project in Xinjiang Chemical Industry. Leveraging the advantages of self-developed manufacturing integration, LSHEC has overcome the pressure of high temperature construction period and overcome multiple technical difficulties. Multiple equipment have been completed and put into place one after another, fully ensuring timely delivery. Editor/Min Jing
Share

Retrieve password

Get verification code
Sure