[China Energy Construction enters Abu Dhabi]Recently, China Energy Engineering Corporation established a project office in Metal Park, Abu Dhabi, to undertake the EPC project of Taweelah C 2.6GW gas turbine power plant. The project is one of the largest power contracts in the Gulf region this year, with a construction period of approximately 32 months.Editor/Gao Xue
Kazakhstan's Deputy Minister of Transport Rastayev met with Zhang Liang, Vice President of Urumqi Airlines, to discuss the establishment of a joint venture airline and the opening of three new China Kazakhstan routes, with C909 as the main aircraft model. The route is expected to depart in September, helping domestic regional aircraft deepen their cultivation in Central Asia and improve the air passage between China and Kazakhstan. Editor/Min Jing
On August 2, 2026, Zhang Qijun announced at the annual meeting of Sun Island that the main body of the Heihe to Blagoveshchensk cross-border cableway had been completed, and the project would be completed within the year. The one-way travel time of the cableway is only 6 to 8 minutes. After completion, it will improve the three-dimensional cross-border transportation system in Heihe and promote the coordinated development of cultural, tourism, and commercial trade on the China Russia border. Editor/Min Jing