[Shaanxi Coal to Jiangsu Iron and Steel Intermodal Coal Special Train Launched] The 24211 freight train, loaded with over 3000 tons of coal, slowly departed from Zhongji Station on August 5, 2026, heading south towards Yangtun Station in Jiangsu Province. It then passed through Xuzhou Port and was transported by waterway before finally arriving at Pizhou Port.Editor/Cheng Liting
Click to see more live >>
Latest
  • 2026.08.07 15:53
  • [Shanxi's wind and solar power installed capacity exceeds 80 million kilowatts]
  • As of the end of June 2026, the installed capacity of wind and solar new energy power generation in Shanxi Province has exceeded 80 million kilowatts, reaching 80.6121 million kilowatts. During the 14th Five Year Plan period, the province added 45.0091 million kilowatts of wind and solar new energy power generation installed capacity, an increase of 137.11% compared to the end of the 13th Five Year Plan.Editor/Cheng Liting
Share

Retrieve password

Get verification code
Sure