[CEEC Wins Bid for Xinjiang's First Long-Duration Grid-Forming Storage Project] Recently, CEEC won the bid for the Xinjiang Shache 200 MW/1200 MW grid type independent energy storage project, which is the first 6-hour long grid energy storage demonstration project in southern Xinjiang. The project is equipped with a 220 kV booster station, which can consume approximately 110 million kilowatt hours of abandoned photovoltaic power annually after commissioning, supporting the integration of local new energy bases into the grid. Editor/Min Jing
Click to see more live >>
Latest
  • 2026.10.15 11:24
  • [Liu Haixing Meets Saudi Ambassador to China Alharbi and GCC Envoys in Beijing]
  • On October 14, 2026, Liu Haixing met with Saudi Ambassador to China Halby in Beijing and had a collective exchange with the Gulf Cooperation Council's ambassadors in China. Both sides reviewed the achievements of China Saudi Arabia China Sea cooperation and exchanged views on deepening strategic mutual trust, expanding practical cooperation, and promoting peace and stability in the Middle East region. Editor/Min Jing
  • 2026.10.15 11:23
  • [Dongfang Electric Boiler Lights Up at Huaneng Haimen Project]
  • Recently, the 5th boiler of the Huaneng Haimen project, developed by DEC, was successfully ignited once. This unit is the first million kilowatt counter combustion tower boiler in China, filling the technological gap in the country. After being put into operation, it will increase its annual electricity output by 8 to 10 billion kilowatt hours and support the construction of an integrated wind solar thermal storage base. Editor/Min Jing
Share

Retrieve password

Get verification code
Sure