[The largest LNG receiving station in Northeast China has been completed]On September 29, 2026, the largest LNG receiving station in Northeast China, the Yingkou LNG receiving station, was completed in Yingkou, Liaoning and entered the stage of joint commissioning and production preparation. After the project reaches its production capacity, its annual LNG unloading capacity will reach 6.2 million tons, and its annual natural gas supply capacity will reach 8.7 billion cubic meters.Editor/Gong Ziwei
On September 28, 2026, CNOOC Tianjin Branch completed drilling operations for 100 wells in the booming area of Bohai Oilfield, with new well production exceeding the allocated capacity, resulting in an average daily increase of over 3000 cubic meters of crude oil in Penglai Oilfield Group. The project has overcome multiple drilling difficulties, optimized the process to speed up and increase efficiency, and the drilling plan in this area will increase by nearly 80% year-on-year in 2026. Editor/Min Jing
On September 29, 2026, at SGCC headquarters, Zhang Zhigang and Zhang Wenfeng held talks with CHD Ye Xiangdong and Xu Shubiao. Both sides will deepen practical cooperation based on the 15th Five Year Plan, coordinate the implementation of power supply guarantee, work together to promote the construction of a new power system, and assist in the high-quality development of the energy and power industry. Several corporate executives will attend and exchange ideas. Editor/Min Jing