[Gansu's new energy power output reaches new highs]On October 9, 2026, it was learned from State Grid Gansu Electric Power Company that the new energy power generation in Gansu Province reached 496 million kilowatt hours, surpassing the total electricity consumption of the province for the first time and reaching 103.95% of the province's electricity consumption on that day. At 11:51 on the same day, the maximum output of new energy in Gansu power grid climbed to 28.88 million kilowatts, accounting for 80.8% of the total power generation output in the province at that time. Both electricity and power consumption indicators have broken historical records.Editor/Gong Ziwei
On November 10, 2026 local time, the road design and construction project for the Sacklepi to Tapita section of the southeastern corridor in Liberia, undertaken by China Railway Seventh Bureau Overseas Company, was issued a preliminary acceptance certificate by the infrastructure implementation unit of the owner's Public Works Department. The main project has been substantially completed and entered the defect liability period. The project is 61.33 kilometers long and adopts a design build transfer model.Editor/Cheng Liting
On November 10, 2026, the Jiaxing Transportation Construction Engineering Industry Workers' Living Environment Improvement Conference was held in Tongxiang. Attendees observed the G60 Shanghai Kunming Expressway Tongxiang Gaoqiao section reconstruction project on site. At present, the project has completed an investment of 2 billion yuan, which is 88.5% of the annual plan, and the lower structure of the bridge has been fully deployed. This 13.7-kilometer high-speed reconstruction line will release passage space for Shanghai Hangzhou high-speed railway related projects. After completion, it can release nearly 6400 acres of development land to support the construction of Tongxiang High speed Railway Industry New City. Editor/Cheng Liting