[The largest mining new energy power system in Africa has been put into operation] Recently, the Phase II of the Congo (Kinshasa) Kaipeng Mining New Energy Power System, provided by Nanrui Jibao for overall planning and core equipment, has been officially put into operation, making it the largest mining new energy power system currently in operation in African mining areas. The project has a network energy storage capacity of 300MW/900MWh, supported by 440MWp photovoltaics, forming a complementary system of photovoltaic energy storage and diesel multiple power sources, which can adapt to the operating conditions of weak grid mining areas in Africa and create a benchmark sample for photovoltaic energy storage applications in African mines. Editor/Cheng Liting
Click to see more live >>
Latest
  • 2026.10.22 13:40
  • [The trading volume of carbon emissions trading in China has exceeded 1 billion tons]
  • On October 21, 2026, Vice Minister of Ecology and Environment Li Gao announced at a press conference held by the State Council Information Office that the national carbon emission trading market has been online for more than five years, and has built the world's largest carbon emission trading market. Currently, the controlled carbon dioxide emissions are about 8.3 billion tons, accounting for more than 65% of the total national carbon dioxide emissions. Recently, the cumulative trading volume of quotas has exceeded 1 billion tons. Editor/Cheng Liting
  • 2026.10.22 13:39
  • [The total electricity consumption in September increased by 1.2% year-on-year]
  • In September 2026, the total electricity consumption of the society reached 899.7 billion kilowatt hours, a year-on-year increase of 1.2%. From January to September, the total electricity consumption of the whole society reached 807.34 billion kilowatt hours, a year-on-year increase of 3.9%. Editor/Cheng Liting
Share

Retrieve password

Get verification code
Sure