[The Yi gas processing project accounts for 36%]In 2026, the Latavi natural gas processing project in Iraq will reach a progress rate of 36%, with CPECC undertaking a $1.61 billion EPC and a daily processing capacity of 300 million cubic feet in the first phase.Editor/Gao Xue
On October 30, 2026, it was learned from State Grid Sichuan Electric Power Company that as of now, the ± 800 kV Baihetan to Jiangsu UHVDC transmission project has delivered over 100.02 billion kilowatt hours of clean hydropower to Jiangsu, equivalent to reducing standard coal consumption by nearly 30 million tons and reducing carbon dioxide emissions by over 90 million tons, continuously injecting green energy into the development of the Yangtze River Delta region.Editor/Gong Ziwei
In recent years, the proportion of new energy installed capacity in China's plateau has increased from an average of 28.5% in the past five years to 52.9%, which is 4.4 percentage points higher than the national average level. As of the end of September 2026, the installed capacity of new energy power generation in high-altitude areas of China is 528 million kilowatts, accounting for 25.6% of the country's new energy.Editor/Gong Ziwei