[China-Aided Post-Disaster Bridge Reconstruction Kicks Off in Gampaha]On November 1, 2026, China's emergency aid project for post disaster bridge reconstruction in Sri Lanka began construction on the first bridge in the western city of Gampoha. Ambassador Wei Huaxiang and two Sri Lankan ministers attended the event, signed a project proposal exchange letter, and donated stationery and supplies to local elementary school students. Editor/Min Jing
On October 29, 2026, the signal system of the Khorgos Silk Road Special Line Junction Station contracted by First Engineering Co., Ltd. will be put into operation at one time, realizing zero fault tolerance. The line will be paved for 7 kilometers, with a design capacity of 6 million tons, and is ready for operation. Editor/Min Jing
Recently, the Yuxi section of the Yunnan Central Water Diversion Phase II supporting project, undertaken by CRFG, has achieved full tunnel connectivity. The controlled project, Chengjiang Tunnel, has a total length of 6426 meters and can supply 40.34 million cubic meters of water to the Chengjiang area annually after completion, providing additional protection for the ecological security of Fuxian Lake. Editor/Min Jing